Jameel Somji

They don’t want to spend too much time on a project. The maximum amount of time they’d like to spend is about two months on a project, but they want something that’s structured and meaningful. The good thing with the sprint methodology is that it provides structure.

鍵盤快捷鍵Keyboard shortcuts

j 下一段next speechk 上一段previous speech